Hold the idea. Hold the numbers.
A good scheme survives the operator, the cost plan and the authorities. This is how Iain runs design so it does.

Five steps, every project.
Test the brief
Review the brief, the programme and the business case before drawing. Most problems start here.
Site and test fit
Site analysis, planning options and test fits that show what the land can really hold.
Concept and massing
Massing studies and a clear concept that carries the brand, the views and the guest journey.
Design governance
Design principles, review protocols and quality benchmarks that every consultant works to.
Coordinate to delivery
Oversight through design development with operators, engineers and builders, so the idea arrives on site.
Both sides of the table.
- Concepts, master plans and test fits
- Leads the design team and the drawings
- Hotel facility schedules before the operator is chosen
- Competition entries
- Briefs and manages the design consultants
- Runs design reviews and quality gates
- Liaises with operators on brand standards
- Checks cost, area and programme at every stage
Questions clients ask.
Do you work outside Australia?
Yes. Most of Iain's work has been in the Middle East and Asia, and he still works there. The studio is in Brisbane.
Can you join a project that has already started?
Yes. Peer reviews and design management roles often start mid-way. A short review of the current scheme is usually the first step.
Do you produce full construction documents?
Iain leads concept, design development and design management. For documentation he works with local architects of record and design-build teams.
Can you work alongside our operator?
Yes. Operator liaison and brand standards are a core part of his hotel work, both before and after the operator is appointed.